Skip to content
  • High Speed Steel Lead time 6-10 Weeks (Custom 8-12 weeks) * Carbide lead time 8-12 weeks * Headspace Gauge lead time 6-10 weeks on Gauges (Custom 8-12 weeks)*
Indicator Rods Indicator Rods

Indicator Rods

The straight "pilot" end with a tight fitting bushing is inserted into the bore until the tapered section is a snug fit. A dial indicator is then used to zero the barrel.

 

30 products

  • Sold Out

  • Sold Out

  • Sold Out

  • Sold Out

  • Sold Out

  • Sold Out

  • Sold Out

  • Sold Out

  • Sold Out

  • Sold Out

  • Sold Out

  • Sold Out

  • Sold Out

  • Sold Out

  • Sold Out

  • Sold Out

  • Sold Out

  • Sold Out

Back to top